Definition of Electrical Risks Assessment
Electrical risks assessment is the process of developing an understanding of a risk. Risk analysis provides input for the risk evaluation process and in making decisions about whether a risk needs to be controlled and choosing the right control strategies and methods. Risk analysis is part of the risk assessment stage in the risk management process and is carried out on risks that have been identified in the risk identification process. The position of risk analysis in the risk management process based on ISO 31000 is as follows. —Omazaki Consultant is a consultant who provides consulting services for assessing or assessing electrical risks in electrical systems or power systems. Contact us by sending an email to cs@omazaki.co.id or filling out the form at contact.
———————————————
Type of Electrical Risks
———————————————
Electrical Risk Management at a Glance
Meanwhile, a risk register is a document used as a risk management tool and to meet regulatory compliance that acts as a repository for all identified risks and includes additional information about each risk, for example, the nature of the risk, reference and owner, mitigation actions.
———————————————
References
———————————————
Contact Omazaki Consultant if you need consulting services by an electrical risk assessment consultant for your existing electrical power system.
———————————————